Perencanaan Sistem Pembangkit Listrik Tenaga Surya (PLTS) Off Grid Pada Atap Bangunan Pelelangan Ikan di Pelabuhan Perikanan Nusantara (PPN) Brondong

Prawira, Noven Nanda Karul (2025) Perencanaan Sistem Pembangkit Listrik Tenaga Surya (PLTS) Off Grid Pada Atap Bangunan Pelelangan Ikan di Pelabuhan Perikanan Nusantara (PPN) Brondong. Undergraduate thesis, Politeknik Negeri Jember.

[img] Text (Abstract)
Abstract.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (147kB)
[img] Text (Bab 1 Pendahuluan)
Bab 1 Pendahuluan.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (214kB)
[img] Text (Daftar Pustaka)
Daftar Pustaka.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (158kB)
[img] Text (Laporan Lengkap)
Laporan Lengkap.pdf - Submitted Version
Restricted to Registered users only

Download (4MB) | Request a copy

Abstract

Pelabuhan Perikanan Nusantara (PPN) Brondong is one of the major fisheries activity centers that requires a reliable electricity supply to support the daily operation of the fish auction building. This study aims to design an off-grid solar power plant (PLTS) installed on the rooftop of the fish auction building at PPN Brondong as an effort to provide an independent and sustainable energy supply. The research methodology includes literature review, site survey, electrical load data collection, calculation of PLTS component capacities, and technical system design using OpenSolar and AutoCAD software.The design results indicate that the total daily electrical energy demand reaches approximately 192.49 kWh/day with a peak power of ±16.45 kW. The PLTS system is designed using 98 units of 650 Wp solar panels with a total installed capacity of approximately 63.7 kWp, 7 MPPT units, 2 units of 48 V inverters with a capacity of 12 kW each, and 33 units of 48 V 200 Ah lithium batteries. The estimated initial investment cost of the off-grid PLTS system is IDR 2,494,676,418. Based on the economic analysis, the system has a payback period of approximately 25 years; therefore, its implementation is primarily intended to achieve long-term operational cost savings and support environmental sustainability. The results of this study are expected to serve as a technical reference and a pilot model for the application of renewable energy in coastal areas, particularly in the fisheries sector.

Item Type: Thesis (Undergraduate)
Contributors:
ContributionContributorsNIDN/NIDK
Thesis advisorAnwar, SaifulNIDN0025126905
Uncontrolled Keywords: PLTS Off-grid, Solar Energy, PPN Brondong, System Design.
Subjects: 410 - Rumpun Ilmu Teknik > 430 - Ilmu Keteknikan Industri > 443 - Teknik Enerji
410 - Rumpun Ilmu Teknik > 450 - Teknik Elektro dan Informatika > 451 - Teknik Elektro
410 - Rumpun Ilmu Teknik > 450 - Teknik Elektro dan Informatika > 452 - Teknik Tenaga Elektrik
Divisions: Jurusan Teknik > Prodi D4 Teknik Energi Terbarukan > Tugas Akhir
Depositing User: Noven Nanda Karul Prawira
Date Deposited: 27 Jan 2026 03:44
Last Modified: 27 Jan 2026 03:44
URI: https://sipora.polije.ac.id/id/eprint/52448

Actions (login required)

View Item View Item