Rizal, Syamsul (2025) Perencanaan Pembangkit Listrik Tenaga Surya Sistem Off-Grid Di Dusun Pemalikan Desa Batu Putih Kecamatan Sekotong Kabupaten Lombok Barat. Undergraduate thesis, Politeknik Negeri Jember.
|
Text (Abstract)
1. Syamsul Rizal-Abstract.pdf - Submitted Version Available under License Creative Commons Attribution Share Alike. Download (113kB) |
|
|
Text (Bab 1 Pendahuluan)
2. Syamsul Rizal-Bab 1.pdf - Submitted Version Available under License Creative Commons Attribution Share Alike. Download (21kB) |
|
|
Text (Daftar Pustaka)
3. Syamsul Rizal-Daftar Pustaka.pdf - Submitted Version Available under License Creative Commons Attribution Share Alike. Download (132kB) |
|
|
Text (Laporan Lengkap)
4. Syamsul Rizal-Full Text.pdf - Submitted Version Restricted to Registered users only Download (2MB) | Request a copy |
Abstract
Pemalikan Hamlet, located in Batu Putih Village, Sekotong District, West Lombok Regency, is an area that has not yet been connected to the PLN electricity grid,resulting in limited energy supply for daily community needs. This condition serves as the basis for conducting a study aimed at designing an Off-Grid Solar Power Plant system as a reliable and sustainable primary energy source for the local community. The research methodology includes field surveys, collection of electrical load data, measurement of solar irradiation intensity, and energy demand analysis to determine the capacity of solar panels, batteries, and inverters based on PUIL 2011 and SNI 04-6958-2003 standards. The design results show that the community’s daily energy demand reaches 16,580 Wh with a peak load of 5,805 W, supplied by a 5.55 kWp PLTS system consisting of 10 Trina Solar Vertex 555 Wp panels, an 8 kW Huawei SUN2000-8KTL-M1 inverter, and six Huawei LUNA2000 batteries with a total capacity of 30 kWh. The total estimated cost for the Off-Grid PLTS system design in Pemalikan Hamlet is IDR 167,000,000.
| Item Type: | Thesis (Undergraduate) | ||||||
|---|---|---|---|---|---|---|---|
| Contributors: |
|
||||||
| Uncontrolled Keywords: | battery, capacity of solar panels, Off-Grid | ||||||
| Subjects: | 410 - Rumpun Ilmu Teknik > 430 - Ilmu Keteknikan Industri > 443 - Teknik Enerji 410 - Rumpun Ilmu Teknik > 450 - Teknik Elektro dan Informatika > 451 - Teknik Elektro 410 - Rumpun Ilmu Teknik > 450 - Teknik Elektro dan Informatika > 452 - Teknik Tenaga Elektrik |
||||||
| Divisions: | Jurusan Teknik > Prodi D4 Teknik Energi Terbarukan > PKL | ||||||
| Depositing User: | Syamsul Rizal | ||||||
| Date Deposited: | 12 Jan 2026 02:44 | ||||||
| Last Modified: | 12 Jan 2026 02:45 | ||||||
| URI: | https://sipora.polije.ac.id/id/eprint/50624 |
Actions (login required)
![]() |
View Item |
