Anelia, Zaifatul (2024) Analisis Kesiapan Penerapan Rekam Medis Elektronik Menggunakan Metode DOQ-IT di Puskesmas Talango Sumenep. Undergraduate thesis, Politeknik Negeri Jember.
Text (Abstract)
Abstract.pdf - Submitted Version Available under License Creative Commons Attribution Share Alike. Download (2MB) |
|
Text (Bab 1 Pendahuluan)
Bab 1 Pendahuluan.pdf - Submitted Version Available under License Creative Commons Attribution Share Alike. Download (2MB) |
|
Text (Daftar Pustaka)
Daftar Pustaka.pdf - Submitted Version Available under License Creative Commons Attribution Share Alike. Download (2MB) |
|
Text (Laporan Lengkap)
Laporan Lengkap_Zaifatul Anelia_G41200621.pdf - Submitted Version Restricted to Registered users only Download (17MB) | Request a copy |
Abstract
Regulation of the Indonesian Minister of Health Number 24 Year 2022 requires all health care facilities to use electronic medical records. EMR is a medical record recording system that is carried out electronically to improve service efficiency. Talango Health Centre plans to implement EMR to follow up on the regulation but there are still obstacles that hinder it. For example, there is no strategy, SOP, computers in several units and budget. In addition, staff have not received training on EMR implementation. Therefore, an assessment of EMR implementation readiness is needed to identify the priority scale that needs to be addressed so that EMR implementation can run optimally. This study aims to analyse the readiness of EMR implementation at Talango Health Centre. This research is a quantitative research. The sample size was 41 respondents. The data collection technique use a questionnaire. The method used is the DOQ-IT method with 4 variables namely human resources, organisational work culture, leadership governance and IT infrastructure. The overall readiness of EMR implementation at Talango Health Centre is in range II with a value of 142.66. Human resources are in the moderately ready category with a score of 2.791 Organisational work culture is in the moderately ready category with a score of 2.799. Leadership governance is in the moderately prepared category with a score of 2.972. IT infrastructure is in the very ready category with a score of 3,290. With that said, it can be concluded that the Talango Health Centre is quite ready to implement EMR. Suggestions for improvements that must be made are making SOP, guidebooks and providing socialization and training to potential users.
Item Type: | Thesis (Undergraduate) | ||||||
---|---|---|---|---|---|---|---|
Contributors: |
|
||||||
Uncontrolled Keywords: | DOQ-IT, EMR, Public Health Center, Readiness of Implementation EMR | ||||||
Subjects: | 340 - Rumpun Ilmu Kesehatan > 350 - Ilmu Kesehatan Umum > 353 - Kebijakan Kesehatan (dan Analis Kesehatan) 340 - Rumpun Ilmu Kesehatan > 350 - Ilmu Kesehatan Umum > Sistem Informasi Kesehatan |
||||||
Divisions: | Jurusan Kesehatan > Prodi D4 Manajemen Informasi Kesehatan > Tugas Akhir | ||||||
Depositing User: | Zaifatul Anelia | ||||||
Date Deposited: | 23 Aug 2024 03:47 | ||||||
Last Modified: | 23 Aug 2024 03:48 | ||||||
URI: | https://sipora.polije.ac.id/id/eprint/36906 |
Actions (login required)
View Item |