Analisis Tekno Ekonomi Pada Perencanaan PLTB Rooftop Off Grid Di Pt. Indonesia Power PGU Bali Unit PLTG Gilimanuk

Sendika, Tri Pratining (2020) Analisis Tekno Ekonomi Pada Perencanaan PLTB Rooftop Off Grid Di Pt. Indonesia Power PGU Bali Unit PLTG Gilimanuk. Undergraduate thesis, Politeknik Negeri Jember.

[img] Text (Abstract)
7. Abstract.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (8kB)
[img] Text (Bab 1 Pendahuluan)
14. BAB 1.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (89kB)
[img] Text (Daftar Pustaka)
19. Daftar Pustaka.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (147kB)
[img] Text (Tugas Akhir Full Test)
Proposal skripsi full.pdf - Submitted Version
Restricted to Repository staff only

Download (1MB) | Request a copy

Abstract

The Gilimanuk PLTG area is an area close to the coast that has a suitable wind gust as a household scale PLTB development. The plan to build PLTB Rooftop is based on data obtained from BMKG Jembrana-Bali III in 2019 in the form of average wind speeds ranging from 2.32916m / s - 5,611317 m / s. This wind energy will be used to generate wind turbine type i-500 with 172.5 Watt power from wind power of 213.639 Watt. Other auxiliary components used include the inverter made by Tesup 12/24 Vdc into 110/220 Vac, and BCR (Battery Charge Regulated) of the VRLA Gel type with a parallel 24V series voltage and a load of 12 units of 60watt LED garden lights / unit in the PLTG area. Gilimanuk. Systematics of the financial and economic aspects of the project obtained the net present value (NPV) of 16.597 and a BCR of 1.51, the ability to produce a united investment value (PI) return of 2.12. So, from these results it is known that the internal rate of return (IRR) is 11.14% with a return on investment (ROI) of 6.6% for 20 years, because the value of cash flow assets varies, resulting in a payback period (PP) of 7 years so that this planning project proposal is said to be accepted and feasible to run.

Item Type: Thesis (Undergraduate)
Contributors:
ContributionContributorsNIDN/NIDK
Thesis advisorRudiyanto, BayuNIDN0021127307
Uncontrolled Keywords: BCR, BMKG Jembrana-Bali, IRR, NPV, PI, PLTB rooftop, PP, ROI, turbin angin i-500.
Subjects: 410 - Rumpun Ilmu Teknik > 430 - Ilmu Keteknikan Industri > 443 - Teknik Enerji
Divisions: Jurusan Teknik > Prodi D4 Teknik Energi Terbarukan > Tugas Akhir
Depositing User: Tri Pratining Sendika
Date Deposited: 16 Mar 2021 02:37
Last Modified: 17 Mar 2021 03:51
URI: https://sipora.polije.ac.id/id/eprint/3270

Actions (login required)

View Item View Item