Lumban Gaol, Gabriella Natalie (2023) Perencanaan dan Analisis Tekno Ekonomi PLTS Rooftop Berbasis On Grid Pada Gedung Teknologi Pertanian Politeknik Negeri Jember Menggunakan Software PVsyst. Undergraduate thesis, Politeknik Negeri Jember.
Text (Abstract)
Abstract.pdf - Submitted Version Available under License Creative Commons Attribution Share Alike. Download (726kB) |
|
Text (Bab 1 Pendahuluan)
Bab 1 Pendahuluan.pdf - Submitted Version Available under License Creative Commons Attribution Share Alike. Download (811kB) |
|
Text (Daftar Pustaka)
Daftar Pustaka.pdf - Submitted Version Available under License Creative Commons Attribution Share Alike. Download (806kB) |
|
Text (Laporan Lengkap)
Laporan Lengkap.pdf Restricted to Registered users only Download (2MB) | Request a copy |
Abstract
Increasing energy needs are directly proportional to population growth and technological developments. Most of the energy in Indonesia is currently obtained from fossil energy sources which have limitations and in an inhospitable environment with high emissions. In Indonesia there is great potential to utilize solar thermal energy as a renewable and environmentally friendly energy source. The potential for solar thermal energy in Indonesia reaches 4.8 kWh/m2 and can be used as an energy source for Solar Power Plants (PLTS). The method of this research is a quantitative method used in planning the construction of on grid PLTS systems and techno-economic analysis using the PVSyst software. The results obtained from this plan require the components of 40 Longi Solar LR5-72HPH-550M solar panels and 1 Huawei SUN2000-20KTL-M2 inverter. The estimated production of electrical energy is 34,339.32 kWh/year in the first year. The initial investment cost for this PLTS system is Rp. 318,394,986. The estimated savings obtained for 25 years amount to IDR 854,734,570. Economically, based on the feasibility analysis using the method based on the calculation of the LWBP rate, the NPV value is Rp. 74,246,383, BCR 2.26 and PBP 9.8 years. Based on the feasibility analysis using the method based on LCoE calculations, the NPV value was Rp. 138,776,660, BCR 2.61 and PBP 8.4 years. Based on the research that has been done, the construction of PLTS in the Agricultural Technology Building is feasible.
Item Type: | Thesis (Undergraduate) | ||||||
---|---|---|---|---|---|---|---|
Contributors: |
|
||||||
Uncontrolled Keywords: | On-Grid, Savings, PLTS, PVsyst, Techno- Economy | ||||||
Subjects: | 410 - Rumpun Ilmu Teknik > 430 - Ilmu Keteknikan Industri > 443 - Teknik Enerji | ||||||
Divisions: | Jurusan Teknik > Prodi D4 Teknik Energi Terbarukan > Tugas Akhir | ||||||
Depositing User: | Gabriella Natalie L Gaol | ||||||
Date Deposited: | 03 Aug 2023 04:17 | ||||||
Last Modified: | 03 Aug 2023 04:18 | ||||||
URI: | https://sipora.polije.ac.id/id/eprint/27389 |
Actions (login required)
View Item |