anshori, M. alwi (2019) Rancang Bangun Sistem Kendali Suhu Dalam Proses Pengasapan Karet RSS (Ribbed Smoked Sheet) Berbasis Mikrokontroler di PTPN XII Kebun Renteng. Undergraduate thesis, Politeknik Negeri Jember.
Text (Pendahuluan)
15. BAB 1. PENDAHULUAN.pdf - Submitted Version Available under License Creative Commons Attribution Share Alike. Download (16kB) |
|
Text (Daftar Pustaka)
20. DAFTAR PUSTAKA.pdf - Submitted Version Available under License Creative Commons Attribution Share Alike. Download (88kB) |
|
Text (Laporan Lengkap)
22. H41151396 LAPORAN LENGKAP SKRIPSI.pdf Restricted to Registered users only Download (2MB) |
|
Text (Abstact)
08. ABSTRACT.pdf - Submitted Version Available under License Creative Commons Attribution Share Alike. Download (8kB) |
Abstract
Rubber plant (Hevea brasisliensis) is an important plantation plant in both the economic context of the society and the source of non-oil foreign exchange producers for the state. In 2015 the area of rubber plantation Indonesia 3,621,102 hectares, with a total production of 3,145,398 tonnes. Indonesia is the largest rubber producer in the world, although it is currently ranked second after Thailand and Malaysia. The process of drying and preserving rubber (sheet) is done by the fuming means to dry the sheet, giving a distinctive color of chocolate and inhibit the growth of fungi on the surface of rubber sheets. This is due to smoke containing an antiseptic substance that can prevent the growth of mycoorganisms. The process of rubber fuming at PTPN XII of Kebun Renteng Jember is still done conventionally, therefore it is necessary that the equipment can help the worker in the process of fuming the rubber by using a component Mikrontroler proportional method in order to Rubber fumoration process is more optimal. In this study resulted in a study state of 0,037-2.3% with a set point of day 1:43 °c, Day 2:48 °c, Day 3:53 °c, Day 4:58 °c, Day 5:58 ° C.
Item Type: | Thesis (Undergraduate) | ||||||
---|---|---|---|---|---|---|---|
Contributors: |
|
||||||
Subjects: | 410 - Rumpun Ilmu Teknik > 470 - Teknologi Kebumian > 473 - Teknik Pertambangan (Rekayasa Pertambangan) | ||||||
Divisions: | Jurusan Teknik > Prodi D4 Teknik Energi Terbarukan > Tugas Akhir | ||||||
Depositing User: | Riza Nuraini Octavia | ||||||
Date Deposited: | 30 Jan 2023 01:56 | ||||||
Last Modified: | 30 Jan 2023 01:56 | ||||||
URI: | https://sipora.polije.ac.id/id/eprint/19252 |
Actions (login required)
View Item |