Camilia, Nurindini Syahadatin (2023) Implementasi TPM Berdasarkan OEE dan Six Big Losses Mesin Pengemas Multi-Line di PT. Marimas Putera Kencana. Undergraduate thesis, Politeknik Negeri Jember.
Text (Abstract)
1. Nurindini S. C. - Abstract.pdf - Submitted Version Available under License Creative Commons Attribution Share Alike. Download (96kB) |
|
Text (Bab 1 Pendahuluan)
2. Nurindini S. C. - Bab 1.pdf - Submitted Version Available under License Creative Commons Attribution Share Alike. Download (106kB) |
|
Text (Daftara Pustaka)
3. Nurindini S. C. - Daftar Pustaka.pdf - Submitted Version Available under License Creative Commons Attribution Share Alike. Download (103kB) |
|
Text (Full Text)
Nurindini S. C. - Full Text.pdf Restricted to Registered users only Download (1MB) | Request a copy |
Abstract
The effectiveness of a machine in the production process will affect for productivity result, high effectiveness will increase production productivity and vice versa. The multi-line packaging machine at PT. Marimas Putera Kencana is a machine that is in continuous use with a large capacity, so if it breaks down, it will have high losses and affect the effectiveness. The calculation using the Overall Equipment Effectiveness (OEE) method is used as an indicator that can show the cause of the ineffectiveness of a machine by calculating the six major losses, so that companies can find out the weaknesses that exist and the improvements that need to be made. The analytical tools used in this study are the Pareto chart for determining the critical point of loss and the cause and effect chart for determining the cause of the loss. To overcome these problems can be done through the application of Total Productive Maintenance (TPM), it aims to achieve ideal performance and zero loss or no defects, breakdowns, accidents and waste in the production process and changeover. The result of this research is the multi-line machine 01 as a special research object. The OEE value has not reached the world class standard of 79,3%. The loss factors that affect the failure to achieve effectiveness are speed loss of 41,2%, unplanned downtime of 27,5% and planned downtime of 24,2%. Suggestions for TPM-based improvements. Proposed improvements based on TPM that can be implemented are Autonomus Maintenance, Planned Maintenance, Focused Improvement, Early Equipment Management and Training & Education.
Item Type: | Thesis (Undergraduate) | ||||||
---|---|---|---|---|---|---|---|
Contributors: |
|
||||||
Subjects: | 140 - Rumpun Ilmu Tanaman > 160 - Teknologi dalam Ilmu Tanaman > 169 - Ilmu Pangan 410 - Rumpun Ilmu Teknik > 430 - Ilmu Keteknikan Industri > 432 - Teknik Produksi (dan Atau Manufakturing) 410 - Rumpun Ilmu Teknik > 430 - Ilmu Keteknikan Industri > 435 - Teknik Industri |
||||||
Divisions: | Jurusan Teknologi Pertanian > Prodi D4 Teknologi Rekayasa Pangan > Tugas Akhir | ||||||
Depositing User: | Nurindini Syahadatin Camilia | ||||||
Date Deposited: | 14 Aug 2023 06:19 | ||||||
Last Modified: | 14 Aug 2023 06:20 | ||||||
URI: | https://sipora.polije.ac.id/id/eprint/27906 |
Actions (login required)
View Item |