Perancangan Sistem Off-Grid Plts Sebagai Sumber Daya Penerangan Lahan Buah Naga Merah Hemat Energi

Putra, Lembar Winata (2021) Perancangan Sistem Off-Grid Plts Sebagai Sumber Daya Penerangan Lahan Buah Naga Merah Hemat Energi. Diploma thesis, Politeknik Negeri Jember.

[img] Text (Abstract)
ABSTRACT.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (5MB)
[img] Text (Bab 1 Pendahuluan)
BAB 1 PENDAHULUAN.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (5MB)
[img] Text (Daftar Pustaka)
DAFTAR PUSTAKA.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (5MB)
[img] Text (Laporan Lengkap)
H41171227_LAPORAN LENGKAP.pdf - Submitted Version
Restricted to Registered users only

Download (5MB) | Request a copy

Abstract

Radiation is the main factor in increasing the productivity of red dragon fruit. This research discusses the design of the PLTS off-grid system as a red dragon fruit lighting resource which is an alternative to reduce electrical energy consumption. The benchmark used to determine the feasibility level of the PLTS off-grid system design is by analyzing the electrical energy produced by the PLTS off-grid system when the sky conditions are clear, cloudy, and cloudy. This research was conducted for several days starting at 07.00 am until 03.00 pm or for 8 hours. According to the study's findings, the electrical energy produced by the PLTS off-grid system when the sky was clear reached 832 WH, when the sky was cloudy it reached 479 Wh, and when the sky was cloudy it only reached 299 Wh. Meanwhile, the electrical energy used to light the red dragon fruit area reached 893 WH. So, when the sky is clear, electrical energy can be used as a source of lighting for red dragon fruit.Meanwhile, the PLTS off-grid system saves Rp. 29,700 in electricity consumption costs per month, so the electricity cost that dragon fruit farmers must pay is Rp. 304,700 per month, including the minimum account fee (RM) for the B-1/TR group. Keywords: Off-grid PLTS system, dragon fruit land and electrical energy

Item Type: Thesis (Diploma)
Contributors:
ContributionContributorsNIDN/NIDK
Thesis advisorNuruddin, MochammadNIDN0011117603
Uncontrolled Keywords: Off-grid PLTS system, dragon fruit land and electrical energy
Subjects: 410 - Rumpun Ilmu Teknik > 430 - Ilmu Keteknikan Industri > 431 - Teknik Mesin (dan Ilmu Permesinan Lain)
Divisions: Jurusan Teknik > Prodi D4 Teknik Energi Terbarukan > Tugas Akhir
Depositing User: Lembar Winata Putra
Date Deposited: 15 Dec 2021 07:21
Last Modified: 15 Dec 2021 07:23
URI: https://sipora.polije.ac.id/id/eprint/8387

Actions (login required)

View Item View Item