Sya'bani, Angga Maufirotus (2026) Analisis Kinerja Pembangkit Listrik Tenaga Mikrohidro (PLTMH) Desa Sumberpoh Kecamatan Maron Kabupaten Probolinggo. Undergraduate thesis, Politeknik Negeri Jember.
|
Text (Abstract)
Abstract.pdf - Submitted Version Available under License Creative Commons Attribution Share Alike. Download (41kB) |
|
|
Text (Bab 1 Pendahuluan)
BAB 1 Pendahuluan.pdf - Submitted Version Available under License Creative Commons Attribution Share Alike. Download (91kB) |
|
|
Text (Daftar Pustaka)
Daftar Pustaka.pdf - Submitted Version Available under License Creative Commons Attribution Share Alike. Download (73kB) |
|
|
Text (Laporan Lengkap)
Skripsi Angga.pdf - Submitted Version Restricted to Registered users only Download (1MB) | Request a copy |
Abstract
The Sumberpoh Village Micro Hydropower Plant (MHPP) utilizes the flow of the Sebaung River as a renewable source of electrical energy. Following the replacement of the generator specifications, an evaluation of the plant's performance was required to obtain data that accurately reflect its current operating conditions. This study aimed to evaluate the performance of the MHPP based on water power potential, generator electrical output, energy conversion efficiency, and power utilization within the distribution system. A quantitative approach was employed through direct field measurements using a current meter, an automatic level waterpass, and a clamp meter, with a total of 14 measurement sessions. The results indicated a water discharge of 0.2131 m³/s and an effective head of 5.78 m, producing a hydraulic power of 12.1 kW and a theoretical electrical power potential of 5.1 kW. The actual electrical power generated was 3.81 kW, with an overall system efficiency of 74.75%, indicating that the energy conversion process was operating effectively. However, the 40kW synchronous generator was still operating under underloaded conditions because the consumer load was only 1.30 kW. In addition, the output frequency of 47 Hz indicated that the generator had not yet reached a stable synchronous speed. Therefore, optimization of the hydraulic system and increased utilization of the generating capacity through load expansion and distribution network development are recommended.
| Item Type: | Thesis (Undergraduate) | ||||||
|---|---|---|---|---|---|---|---|
| Contributors: |
|
||||||
| Uncontrolled Keywords: | Daya Listrik, Debit Air, Efisiensi Sistem, Generator, PLTMH. | ||||||
| Subjects: | 410 - Rumpun Ilmu Teknik > 430 - Ilmu Keteknikan Industri > 431 - Teknik Mesin (dan Ilmu Permesinan Lain) 410 - Rumpun Ilmu Teknik > 430 - Ilmu Keteknikan Industri > 435 - Teknik Industri 410 - Rumpun Ilmu Teknik > 430 - Ilmu Keteknikan Industri > 442 - Teknik Fisika 410 - Rumpun Ilmu Teknik > 430 - Ilmu Keteknikan Industri > 443 - Teknik Enerji 410 - Rumpun Ilmu Teknik > 450 - Teknik Elektro dan Informatika > 451 - Teknik Elektro 410 - Rumpun Ilmu Teknik > 450 - Teknik Elektro dan Informatika > 452 - Teknik Tenaga Elektrik |
||||||
| Divisions: | Jurusan Teknik > Prodi D4 Teknik Energi Terbarukan > Tugas Akhir | ||||||
| Depositing User: | Angga Maufirotus Sya'bani | ||||||
| Date Deposited: | 05 Aug 2026 08:11 | ||||||
| Last Modified: | 05 Aug 2026 08:12 | ||||||
| URI: | https://sipora.polije.ac.id/id/eprint/58998 |
Actions (login required)
![]() |
View Item |
