Perencanaan Dan Analisis Tekno Ekonomi Plts On Grid Di Sd Muhammadiyah 1 Jember Dengan Software Pvsyst

Lestari, Anggita Nuradani (2024) Perencanaan Dan Analisis Tekno Ekonomi Plts On Grid Di Sd Muhammadiyah 1 Jember Dengan Software Pvsyst. Undergraduate thesis, Politeknik Negeri Jember.

[img] Text (Abstract)
skripsi UPLOAD SIPORA-10.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (141kB)
[img] Text (BAB 1)
skripsi UPLOAD SIPORA-21-24.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (140kB)
[img] Text (DAFTAR PUSTAKA)
skripsi UPLOAD SIPORA-103-107.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (214kB)
[img] Text (Laporan Lengkap)
skripsi Anggita Nuradani Lestari.pdf
Restricted to Registered users only

Download (5MB) | Request a copy

Abstract

The demand for electrical energy in Indonesia is increasing from year to year along with the increasing population growth and the national economy. Electricity demand in Indonesia is expected to increase by 4.2% by 2024. Indonesia has a solar energy potential of 4.8 kWh/m2 so, it is suitable for the application of Solar Power Plant (PLTS). This research uses quantitative methods to design a grid-based PLS system and conduct economic analysis using PVSyst software. The results obtained from this design use JA Solar monocrystalline solar panels of type JAM72S30 with a capacity of 550 Wp 12 pieces and 1 Huawei SUN-2000-5KTL-M1 inverter. The total investment cost of PLTS on grid is IDR 102.527.506 with O&Mpw for 25 years amounting to IDR 30.300.789, the cost of replacing the inverter is IDR 17,500,000 and the LCC or life cycle costs incurred are IDR 132.828.304. Based on the calculation of investment feasibility using the NPV, PI, and IRR methods, the investment is not feasible. However, based on the PBP and BCR methods, the investment is feasible. In addition, with the installation of this PLTS, it is estimated that it will save 47% of electrical energy and the electricity bill will save Rp 10,994,940 in the first year. Due to the annual degradation solar panel of 0.55%, the production of electrical energy will decrease so that in the 25th year it is estimated to save up to 9% and electricity bill savings of Rp 2,135,590.

Item Type: Thesis (Undergraduate)
Contributors:
ContributionContributorsNIDN/NIDK
Thesis advisorFahriannur, AhmadNIDN0025088907
Uncontrolled Keywords: PLTS, on grid, PVSyst, Tekno Ekonomi, Penghematan Energi Listrik
Subjects: 410 - Rumpun Ilmu Teknik > 450 - Teknik Elektro dan Informatika > 451 - Teknik Elektro
410 - Rumpun Ilmu Teknik > 450 - Teknik Elektro dan Informatika > 454 - Teknik Elektronika
550 - Rumpun Ilmu Ekonomi > 560 - Ilmu Ekonomi > 561 - Ekonomi Pembangunan
550 - Rumpun Ilmu Ekonomi > 570 - Ilmu Manajemen > 571 - Manajemen
710 - Rumpun Ilmu Pendidikan > 770 - Ilmu MIPA > 775 - Pendidikan Ilmu Pengetahuan Alam (Sains)
Divisions: Jurusan Teknik > Prodi D4 Teknik Energi Terbarukan > Tugas Akhir
Depositing User: Anggita Nuradani Lestari
Date Deposited: 26 Jul 2024 07:27
Last Modified: 26 Jul 2024 07:28
URI: https://sipora.polije.ac.id/id/eprint/35229

Actions (login required)

View Item View Item