Studi Evaluasi Kinerja Turbin Francis Pada Pembangkit Listrik Tenaga Air Di PT.PLN Indonesia Power Mrica Power Generation Unit Sub Unit PLTA Timo

Kurniawan, Khoriya Dwi Islami (2023) Studi Evaluasi Kinerja Turbin Francis Pada Pembangkit Listrik Tenaga Air Di PT.PLN Indonesia Power Mrica Power Generation Unit Sub Unit PLTA Timo. Undergraduate thesis, Politeknik Negeri Jember.

[img] Text (Abstract)
Khoriya dwi_H41191719-9.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (169kB)
[img] Text (Bab 1 Pendahuluan)
Khoriya dwi_H41191719-18-20.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (614kB)
[img] Text (Daftar Pustaka)
Khoriya dwi_H41191719-57-58.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (306kB)
[img] Text (Laporan Lengkap)
Khoriya dwi_H41191719 FULL.pdf
Restricted to Registered users only

Download (9MB) | Request a copy

Abstract

Optimal PLTA operation provides financial benefits and the power generated by the generator is bigger and distributed to consumers. This study aims to determine the effect of water discharge on the efficiency of the Timo hydropower turbine which has been operating for 61 years. The data analysis method used in this study is a quantitative method where the data obtained is then analyzed by means of calculations and graphical analysis. The calculations performed are the calculation of Evective Head, actual discharge, hydraulic power, turbine efficiency, minor losses, major losses and net head. Based on the efficiency obtained, the water flow rate greatly affects the power that can be generated by the turbine, as evidenced by the efficiency results in the dry season as low as 75% and as high as 88%, while during the rainy season the lowest is 85% and the highest reaches 91%.

Item Type: Thesis (Undergraduate)
Contributors:
ContributionContributorsNIDN/NIDK
Thesis advisorWibowo, Michael JokoNIDN0002026208
Uncontrolled Keywords: Discharge, Efficiency, Hydropower, Turbine,Timo.
Subjects: 410 - Rumpun Ilmu Teknik > 430 - Ilmu Keteknikan Industri > 431 - Teknik Mesin (dan Ilmu Permesinan Lain)
410 - Rumpun Ilmu Teknik > 430 - Ilmu Keteknikan Industri > 443 - Teknik Enerji
410 - Rumpun Ilmu Teknik > 450 - Teknik Elektro dan Informatika > 451 - Teknik Elektro
410 - Rumpun Ilmu Teknik > 450 - Teknik Elektro dan Informatika > 452 - Teknik Tenaga Elektrik
Divisions: Jurusan Teknik > Prodi D4 Teknik Energi Terbarukan > Tugas Akhir
Depositing User: Khoriya Dwi Islami Kurniawan
Date Deposited: 26 Jul 2023 14:09
Last Modified: 26 Jul 2023 14:10
URI: https://sipora.polije.ac.id/id/eprint/25923

Actions (login required)

View Item View Item