ANALISIS TEKNO EKONOMI PLTS OFF-GRID KAPASITAS 100 Wp PADA TAMBAK UDANG VANAME BAPAK SUPARMAN DI DAERAH BANYUWANGI

Raroeng, Achmad Noval Kurniawan (2023) ANALISIS TEKNO EKONOMI PLTS OFF-GRID KAPASITAS 100 Wp PADA TAMBAK UDANG VANAME BAPAK SUPARMAN DI DAERAH BANYUWANGI. Undergraduate thesis, Politeknik Negeri Jember.

[img] Text (Abstract)
Abstract...pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (354kB)
[img] Text (Bab 1 Pendahuluan)
Bab 1 Pendahuluan.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (431kB)
[img] Text (Daftar Pustaka)
Daftar Pustaka.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (313kB)
[img] Text (Laporan Lengkap)
Laporan Lengkap.pdf
Restricted to Registered users only

Download (858kB) | Request a copy

Abstract

The level of electricity consumption in Indonesia is increasing along with technological developments and people's lifestyles. Currently, fossil energy is still the dominant energy source. Overcoming this, the government is targeting the role of new and renewable energy in the energy mix by 25%. One of the power plants that utilize renewable energy sources is PLTS (Solar Power Plant). This study aims to determine the advantages and disadvantages of building a PLTS with an off-grid system. This research is divided into several stages, namely literature study, data collection, data analysis, and conclusions. The analytical method used for this research is the net present value (NPV), payback period (PP), benefit cost ratio (B/C) method, and return on investment (ROI). The application of this offgrid PLTS is carried out by shrimp ponds located on Jalan Ikan Paus, Pakem Environment, Banyuwangi Regency. Based on the techno-economic research of the 100 Wp offgrid PLTS, the results showed a cash outflow of Rp. 5,287,304 and cash inflows of IDR 5,198,400. The NPV shows a negative result indicating that the PLTS project is not feasible to build. The time needed to return the capital is 17.1 years. B/C value <1 indicates that the PLTS project is not worth investing in, but the percentage of annual profit (ROI) obtained from investment returns is 5.82%.

Item Type: Thesis (Undergraduate)
Contributors:
ContributionContributorsNIDN/NIDK
Thesis advisorRachmanita, Risse EntikariaNIP198902142018032002
Uncontrolled Keywords: Offgrid, PLTS, Techno Economic
Subjects: 410 - Rumpun Ilmu Teknik > 430 - Ilmu Keteknikan Industri > 443 - Teknik Enerji
Divisions: Jurusan Teknik > Prodi D4 Teknik Energi Terbarukan > Tugas Akhir
Depositing User: Achmad Noval Kurniawan Raroeng
Date Deposited: 12 Jul 2023 02:47
Last Modified: 12 Jul 2023 02:48
URI: https://sipora.polije.ac.id/id/eprint/24636