Perancangan dan Analisi Tekno EkonomiPLTS ON-GRID System Sebagai Supply Energi Listrik Masjid Al-Istiqomah Politeknik Negeri Jember

Winnarni, Argo Tri (2023) Perancangan dan Analisi Tekno EkonomiPLTS ON-GRID System Sebagai Supply Energi Listrik Masjid Al-Istiqomah Politeknik Negeri Jember. Undergraduate thesis, Politeknik Negeri Jember.

[img] Text (Abstrak)
Abstrak.pdf - Accepted Version
Available under License Creative Commons Attribution Share Alike.

Download (257kB)
[img] Text (Bab 1 Pendahuluan)
BAB 1 Pendahuluan.pdf - Accepted Version
Available under License Creative Commons Attribution Share Alike.

Download (652kB)
[img] Text (Daftar Pustaka)
Daftar Pustaka.pdf - Accepted Version
Available under License Creative Commons Attribution Share Alike.

Download (592kB)
[img] Text (Laporan Lengkap)
Laporan Lengkap.pdf
Restricted to Registered users only

Download (19MB) | Request a copy

Abstract

The increase in energy demand is directly proportional to the increase in population growth and technological developments. Energy needs in Indonesia mostly come from fossil energy which has limitations and is not environmentally friendly with emission requirements. The potential for solar thermal energy as renewable and environmentally friendly energy in Indonesia is around 4.8 kWh/m2 which can be utilized as a Solar Power Plant (PLTS). This research aims to design an on-grid PV mini-grid system and techno-economic analysis using PVSyst software. This design requires 14 Longi Solar LR5-72HPH-550M solar panels and 1 Huawei SUN2000-6KTL-M1 inverter. The estimated production of electrical energy produced is 10,852 kWh/year in the first year. The initial investment cost for this PLTS system is IDR 120.343.517. The estimated savings obtained for 25 years amounted to IDR 270.115.412. Economically, based on the feasibility analysis using a method based on calculation from the LWBP rate, the NPV value is IDR 2.174.707, BCR 1.68, and PBP 11.8 years. Meanwhile, based on the feasibility analysis using a method based on LCoE calculations, the NPV value is IDR 74.877.690, BCR 2.61, and PBP 7.5 years. So that the construction of PLTS is feasible to be realized based on the research that has been done.

Item Type: Thesis (Undergraduate)
Contributors:
ContributionContributorsNIDN/NIDK
Thesis advisorRachmanita, Risse EntikariaNIDN0014028902
Uncontrolled Keywords: On-Gridd, Savings, PLTS, PVsyst, Techno-Economic
Subjects: 410 - Rumpun Ilmu Teknik > 430 - Ilmu Keteknikan Industri > 443 - Teknik Enerji
Divisions: Jurusan Teknik > Prodi D4 Teknik Energi Terbarukan > Tugas Akhir
Depositing User: Argo Tri Winnarni
Date Deposited: 07 Jul 2023 04:36
Last Modified: 07 Jul 2023 04:47
URI: https://sipora.polije.ac.id/id/eprint/24498

Actions (login required)

View Item View Item