Analisis Energi Pada Sistem Pembangkit Listrik Tenaga Uap (Studi Kasus Di PLTU PT. Pomi Paiton Jawa Timu)

Taufik, Mohammad (2019) Analisis Energi Pada Sistem Pembangkit Listrik Tenaga Uap (Studi Kasus Di PLTU PT. Pomi Paiton Jawa Timu). Undergraduate thesis, Politeknik Negeri Jember.

[img] Text (Abstract)
08. ABSTRACT.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (9kB)
[img] Text (Bab 1 Pendahuluan)
15. BAB 1 PENDAHULUAAN.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (18kB)
[img] Text (Daftar Pustaka)
20. DAFTAR PUSTAKA.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (129kB)
[img] Text (Laporan Lengkap)
22. H41151606 LAPORAN LENGKAP SKRIPSI.pdf
Restricted to Registered users only

Download (1MB)

Abstract

Energy analysis of steam power plant systems PT. POMI Unit 3 PLTU Paiton East Java is based on the first thermodynamic law. Energy analysis is carried out on the main components of PT.POMI Unit 3 which includes Boilers, High Pressure Turbines / HPT, Intermediate Pressure Turbines / IPT, and Low Pressure Turbines / LPT), Condensers, Condensate Pumps (CP), Low Pressure Heaters (LPH), Daerator, Boiler Feed Pump (BFP), High Pressure Heater (HPH). Energy analysis provides information on energy losses for each component with the largest energy loss occurred in the LPT A that is 505637.613 kW, then followed by LPH of 530013,811 kW, condenser of 365898,946 kW, HPH of 2571113,971 kW, BFP 72992,952 kW, boiler of 61763,6365 kW, and condenser of 365898,946 kW, HPH of 2571113,971 kW, BFP 72992,952 kW, boiler of 61763,6365 kW, and condenser of 365898,946 kW, HPH of 2571113,971 kW, BFP 72992,952 kW, boiler of 61763,6365 kW and Daator of 3657,8,946 kW; 15447.73 kW. While the efficiency of each component of Boiler, CP, LPH 4, LPH 1B, Daerator, HPH 6A, HPH 7A has efficiencies above 90% in turbines of 67.25%. condenser of 13.96%. BFP of 72.59%. LPH and HPH of 64.95% and 89.60%. Nett Plant Heat Rate value from PLTU Unit 3 with a variation of load of 50%, 74 and 87% obtained results that decrease with increasing load where at 50% load NPHR value is 10489.23143 kJ / kWh, at load 74% NPHR value is 10212.44755 kJ / kWh, and at 87% load the NPHR value is 10089,52966 kJ / kWh. These results indicate the lower the value of the Nett Plant Heat Rate, the more reliable and efficient the generating unit is in operating, because the heat energy needed to produce electrical energy of 1 kWh is getting smaller.

Item Type: Thesis (Undergraduate)
Contributors:
ContributionContributorsNIDN/NIDK
Thesis advisorRudiyanto, BayuNIDN197312212002121001
Subjects: 410 - Rumpun Ilmu Teknik > 470 - Teknologi Kebumian > 474 - Teknik Perminyakan (Perminyakan)
Divisions: Jurusan Teknik > Prodi D4 Teknik Energi Terbarukan > Tugas Akhir
Depositing User: Riza Nuraini Octavia
Date Deposited: 04 May 2023 02:19
Last Modified: 04 May 2023 02:20
URI: https://sipora.polije.ac.id/id/eprint/22891

Actions (login required)

View Item View Item