Aditama, Riofaldi Putra (2022) Rancang Bangun Sistem Pembangkit Listrik Tenaga Surya Untuk Suplai Pengisian Daya Baterai Lampu Emergensi Di Dusun Batu Ampar Kecamatan Silo Kabupaten Jember. Diploma thesis, Politeknik Negeri Jember.
Text (Abstrak)
ABSTRACT.pdf - Submitted Version Available under License Creative Commons Attribution Share Alike. Download (3MB) |
|
Text (Bab 1 Pendahuluan)
BAB 1 PENDAHULUAN.pdf - Submitted Version Available under License Creative Commons Attribution Share Alike. Download (3MB) |
|
Text (Daftar Pustaka)
DAFTAR PUSTAKA.pdf - Submitted Version Available under License Creative Commons Attribution Share Alike. Download (3MB) |
|
Text (Laporan Lengkap)
H41181401_LAPORAN LENGKAP.pdf Restricted to Registered users only Download (3MB) | Request a copy |
Abstract
Geographical challenges and limited access to villages are often the reasons why the PLN’s electricity access is difficult to reach many villages in Indonesia, especially in mountain areas and remote island areas in Indonesia. This is as experienced by the residents of RT04/RW17 Batu Ampar, Mulyorejo Village, Silo Sub District, Jember Regency. 12 houses of Batu Ampar Village residents still do not have electricity access, causing the lack of lighting facilities at night. Based on these problems, the solution to this problem is to carry out a solar power plant system contruction for emergency light battery charging supply in Batu Ampar Village, Silo Sub District, Jember Regency. Solar power plant system contruction using solar panels with a capacity of 100 Wp, solar charger controller mppt 60A, 100Ah battery storage, and 500 Watt inverter. The solar power plant system design is used to charge the emergency light batteries that can be used as public lighting access at night. From the research that has been done, the results of the energy consumption need per day for charging 12 emergency lamp batteries reach 208,743 Wh. Meanwhile, energy production has exceeded the energy requirement per day with total energy production from solar panels reaching 350,409 Wh. Keywords : Batu Ampar, Emergency Lamp, Solar Panel
Item Type: | Thesis (Diploma) | ||||||
---|---|---|---|---|---|---|---|
Contributors: |
|
||||||
Uncontrolled Keywords: | Batu Ampar, Emergency Lamp, Solar Panel | ||||||
Subjects: | 410 - Rumpun Ilmu Teknik > 430 - Ilmu Keteknikan Industri > 431 - Teknik Mesin (dan Ilmu Permesinan Lain) | ||||||
Divisions: | Jurusan Teknik > Prodi D4 Teknik Energi Terbarukan > Tugas Akhir | ||||||
Depositing User: | Riofaldi Putra Aditama | ||||||
Date Deposited: | 29 Jun 2022 02:33 | ||||||
Last Modified: | 29 Jun 2022 02:35 | ||||||
URI: | https://sipora.polije.ac.id/id/eprint/12973 |
Actions (login required)
View Item |